Master Plan - Hill Campus

Live Web Cams - Time-Lapse Videos - Dashboard - Other Documents

Softball Field & West Athletic Soccer Field Construction

Status: Construction Phase
Project Contact: Larry Denesha

Clarkson University has added NCAA Division III level women’s softball to its intercollegiate athletic offerings. Construction will be complete ready for competition to begin in the 2013-2014 season.

The location of the west athletic soccer field will be modified to accommodate the new construction.

Project Team Access

Graham Hall Residence Improvements

Status: Construction Phase
Project Contact: Tim McCarthy

Partial interior finish replacement/renovation for Graham Hall.

Project Team Access

Theme Housing Construction

Status: Construction Phase
Project Contact: Devon Sutton/Erin Howlett

An area northwest of the Townhouse Apartments will be developed to accommodate Greek organizations and other shared-interest groups.

Each houses will be built in a Victorian Adirondack style and each design will incorporate many features of the organization’s current location. The houses will be located just off the Loop Road and have walking paths connecting them to the main area of campus, in support of our walking campus approach. Each house will be designed with sustainability as a guiding principle and be sited to minimize the impact on and preserve the beauty of the environment by working around healthy, valuable trees.

Sigma Chi
Project Team Access

Sigma Delta
Project Team Access

Sigma Phi Epsilon
Project Team Access



Woodstock Village Renovations

Status: Construction Phase
Project Contact: John Frary

The renovations involve updating both the interior and exterior of each building while incorporating significant energy reducing measures. The exterior of the buildings are being renovated with an “Adirondack style.” Buildings 3, 5,6,7, and 9 have been completed. Building 2 is scheduled for a Summer 2014 completion. The following buildings are currently under construction with a Fall 2013 completion.

Woodstock Unit #1
Project Team Access

Woodstock Unit #4
Project Team Access

Woodstock Unit #8
Project Team Access

Woodstock Unit #10
Project Team Access



Price Hall Residence Improvements

Status: Construction Phase
Project Contact: Tim McCarthy

Partial interior finish replacement/renovation as well as roof replacement for Price Hall.

Project Team Access

B.H. Snell Hall Basement Classrooms Phase 2

Status: Current Design Phase
Project Contact: Ian Hazen

The B.H. Snell Basement Phase 2 renovation continues to complete the build out of the remaining classrooms.

Clarkson Avenue Main Entrance and Foster House Garden

Status: Conceptual Design
Project Contact: Ian Hazen

The existing entrance road from Clarkson Avenue next to the President's House will be renovated to be a main entrance for the campus. Based on historical patterns for hosting alumni and student events, and projected continued usage of the president’s home to welcome guests of the University, the current garden to the south of the President’s House will be mirrored to double its size to more appropriately accommodate large groups. The garden will be enhanced by a wall, which will honor the memory of Helen Cheel and other significant donors.

ERC Renovation

Status: Conceptual Design
Project Contact: Devon Sutton/Erin Howlett

Renovate and upgrade the existing space to provide a more integrated learning environment that suites today's digital age.

Project Team Access

Holcroft House (Welcome Center)

Status: Conceptual Design
Project Contact: Ian Hazen

The Holcroft House is a former Clarkson family residence currently providing a home-like, welcoming approach by the Admissions staff. The new Welcome Center located on the first floor at the Holcroft house will utilize the former living room and adjoining dining room as a display area for Clarkson family memorabilia. Another area of the Welcome Center will provide for three- to- four large interview rooms that can accommodate prospective students and their families as well as other small groups of five- to- six people.

Renovation also provides additional needed parking for our Admissions building while improving the exterior presence of the building.

Moore House Green Space for Walking Campus

Status: Conceptual Design
Project Contact: Ian Hazen

Future green space between the ERC and Moore House which will replace the current road and parking lot.

Riverfront Soccer Field

Status: Conceptual Design
Project Contact: Ian Hazen



Cheel Arena and Event Center Renovation

Status: Projects in the Queue



TAC - Install 2 Roof Mounted Wind Turbines

Status: Projects in the Queue
Project Contact: Mike Tremper



Cheel Main Lot Renovation

Status: Future Projects



CAMP Future Additions

Status: Future Projects



Hantz Bleachers

Status: Future Projects

The second phase of the Hantz Field construction provides a new grandstand style of seating for the field along with needed landscaping around the field.

Paid Cheel Lot Extension & Main Lot

Status: Future Projects

Reconfiguration and addition to the existing lower Cheel parking lot to accommodate additional parking on campus. The project will net about 30 additional parking spots

Hamlin-Powers Core and Floors 1-3 Renovation

Status: Future Projects



Physical Plant Relocation

Status: Future Projects

The existing Physical Plant buildings and operation will be relocated from the Clarkson Avenue location to the property south of non-university property off Route 11. The purpose of this relocation is twofold: it will minimize safety issues regarding university equipment crossing the public roadway, and it will allow development of the waterfront property.

Quad Center Core - First Year Seminar

Status: Future Projects
Project Contact: Ian Hazen



Quad Floors 1-3 Renovation

Status: Future Projects



Signage/Information Kiosks - Munter Walking Trails

Status: Future Projects
Project Contact: Ian Hazen



South Cheel / CAMP Parking

Status: Future Projects

The new parking lot will be constructed in the wooded area located east of the loop road with an additional 190 spaces. This parking lot will service both the Cheel Campus Center and the CAMP buildings. It will be accessible by a road that extends from the maintenance drive, located on the west side of the Cheel building.

West IRC Parking

Status: Future Projects



Project Map
Construction Phase Expand
Current Design Phase Expand
Conceptual Design Expand


Projects in the Queue Expand
Future Projects Expand
Wish List Projects Expand


Completed Projects Expand